TOWER 10 FORGE APARTMENTS AND RECREATIONAL CENTRE
Back to Projects

Located at the western end of the Wharf’s Entrance precinct, Forge’s form sculpted out of concrete, steel and glass will be one of the first sights visitors to Melbourne and residents will see when they cross the Bolte Bridge into Melbourne.

 

The 30-level and 100 metre-tall building was designed to reflect the gentle rise and ripples of the surrounding water through its gently curved façade that brings a strong sculptural element to the precinct. It is the first tower to be delivered in the Wharf’s Entrance precinct, and it also represents the last chapter of Mirvac’s development parcel to be delivered at Yarra’s Edge.


Watertite installed the following on this project:


2000m2 of Lift Rafts and under slab membrane – Grace Preprufe installation


2,600m Slab edges – liquid detailing


2,500m2 of membrane to balconies


3,000m2 membrane to Podium Slab


Project is due for completion in January 2017